
Chapter 5 Maintaining the Router
Removing and Installing a Chassis
Step 8 Connect the supplemental bonding and grounding connection (if there is one) to the chassis (see Supplemental Bonding and Grounding Connections, page
Step 9 Connect the power cords to the PDUs on the rear of the chassis.
•For AC PDUs, see Step 8 of Removing and Replacing an AC PDU, page
•For 2800 W DC PDUs, see Step 8 of Removing and Replacing a DC PDU, page
Step 10 Power on the circuit breakers to the power supplies.
Step 11 Power on the router.
Packing a Defective Chassis for Shipment
Use the packaging that came with the replacement chassis to repack and ship the defective chassis.
| Cisco XR 12410 Router Installation Guide |
|