C H A P T E R 2

Preparing for Installation

Before installing your router, you must consider power and cabling requirements that must be in place at your installation site, special equipment for installing the router, and the environmental conditions your installation site must meet to maintain normal operation. This chapter guides you through the process of preparing for router installation.

The shipping package for the router is engineered to reduce the chances of product damage associated with routine material handling experienced during shipment.

The router should always be transported or stored in its shipping package in the upright position.

Keep the router in the shipping container until you have determined the installation site.

Inspect all items for shipping damage. If an item appears damaged, contact a

Cisco customer service representative immediately.

This chapter contains the following installation topics:

Safety Guidelines, page 2-2

Site Requirement Guidelines, page 2-6

PRP Port Connection Guidelines, page 2-22

Alarm Display Connection Guidelines, page 2-31

 

 

Cisco XR 12410 Router Installation Guide

 

 

 

 

 

 

OL-13832-01

 

 

2-1

 

 

 

Page 45
Image 45
Cisco Systems XR 12410 manual Preparing for Installation