
Chapter 2 Preparing for Installation
Site Requirement Guidelines
Site Requirement Guidelines
The following sections contain the site requirement guidelines that you should be familiar with before installing the router:
•
•Air Flow Guidelines, page 
•Temperature and Humidity Guidelines, page 
•Power Connection Guidelines, page 
•NEBS Supplemental Unit Bonding and Grounding Guidelines, page 
•Site Wiring Guidelines, page 
Rack-Mounting  Guidelines
The router can be mounted in most 
±0.06 inch (46.50 cm ± 0.15 cm). The 
Figure 2-2 shows examples of typical 2-post,  4-post,  and telco-type  equipment racks.
  | Cisco XR 12410 Router Installation Guide | 
 |