
Chapter 3 Installing the Cisco XR 12410 Router
Removing Components Before Installing the Chassis
Required Tools and Equipment
Before you begin the
•
•Number 1 and number 2 Phillips screwdrivers
•
•Tape measure
•Level (optional)
•A minimum of 10 slotted binderhead screws (usually provided with the rack) to secure the chassis to the mounting flanges (also called rails) in the rack. Five screws should be installed on each side of the chassis.
•
•
•
Unpacking and Positioning the Router
Follow the unpacking instructions shipped with the router and use a safety hand truck to move the router to the location where it is being installed in a rack.
Save the packaging materials in case the router needs repackaging or shipping.
Removing Components Before Installing the Chassis
The router is designed to be lifted by two persons into a rack. To reduce the weight of the system, you can remove some of the components before attempting to lift it into the rack.
| Cisco XR 12410 Router Installation Guide |
|