Migration
Table 7 Migration
Number | Step | See | |
|
|
|
|
1 | Start the migration (HP 3PAR Online Import Utility: | • | For Windows: |
| startmigration command) |
| |
|
|
| |
|
|
| |
|
|
| |
|
| • | For Linux: |
|
|
| |
|
|
| |
|
|
| |
|
| • For | |
|
|
| |
|
|
| |
|
|
| |
|
|
|
|
2 | Restart the host and rescan migrating disks. | • | For Windows: |
| Restart server applications (including cluster). |
| |
|
|
| |
|
|
| |
|
| • | For Linux: |
|
|
| |
|
|
| |
|
| • For | |
|
|
| |
|
|
| |
|
|
| |
3 | Monitor migration with the HP 3PAR Online | ||
| Import Utility until completion. |
|
|
|
|
| |
4 | Optional: Remove the migration definition when | ||
| the migration has completed. |
|
|
|
|
|
|
Table 8
Number Step
1Remove zoning between the EMC Storage system and HP 3PAR StoreServ Storage system after all migrations from the EMC Storage system are complete.
2When all migrations are complete, remove the source storage system (EMC).
3Remove peer zones and reconfigure peer ports to host ports.
.
Offline Migration
Prerequisite Component Installation
Table 9 Prerequisite component
Number | Step | See |
|
|
|
1 | Check the HP SPOCK website to confirm proper | HP SPOCK (http://www.hp.com/storage/spock) |
| configuration. |
|
|
|
|
12 Migration Process Checklists