Post-Migration

Table 12 Post-migration checklist—offline

Number

Step

See

1

Perform the following tasks for offline migration

Follow EMC PowerPath documentation instructions.

1.Unzone the source EMC Storage system from the host.

2.Restart the host.

3.Remove the EMC PowerPath multipath software, if present, and configure native multipath software.

4.Export the LUNs to the host on the HP 3PAR StoreServ Storage system.

2

Remove the source storage system (EMC) when “Performing Post-Migration Tasks” (page 70).

 

all migrations are complete.

14 Migration Process Checklists

Page 14
Image 14
HP Online Import Software manual Post-migration checklist-offline