IBM SY27-0345-06 manual Removing the Adapter Enablement Feature, Installing Optional Adapters

Models: SY27-0345-06

1 148
Download 148 pages 5.77 Kb
Page 86
Image 86
Remove the front screws of the assembly from the front frame.
Remove the screw that fastens the rear of the assembly to the
Tighten all screws on the assembly.
Fasten the front of the assembly to the front frame using the su

3

4 Insert an optional adapter into the module slot to ensure the ada the assembly correctly.

5

6 Attach the dc power cable to the connector on the left-hand side card assembly. Make sure the connector with the jumper is connecte riser card.

7 Connect the jumpers between the base power supply and the adapte supply together.

8 Replace the IBM 2210 cover as described in “Reinstalling the Cove page 4-4.

9 Verify that the IBM 2210 is functioning correctly by using “MAP 02 Operation” on page 2-23.

Removing the Adapter Enablement Feature

1Remove the IBM 2210 cover as described in “Removing the Cover” o page 4-2.

2 Detach the dc power cable from the connector on the left-hand si riser card assembly.

3

4

5 Carefully lift the assembly and riser board out of the socket on board.

6 Remove the adapter power supply from the power supply cover.

Installing Optional Adapters

Refer to “Handling Static-Sensitive Devices” on page 4-2 before removing installing any of the optional adapters.

4-362210 Service and Maintenance

Page 86
Image 86
IBM SY27-0345-06 manual Removing the Adapter Enablement Feature, Installing Optional Adapters