Return to Section TOC
Return to Section TOC
Return to Section TOC
Return to Section TOC
Return to Master TOC
Return to Master TOC
Return to Master TOC
Return to Master TOC
|
| TROUBLESHOOTING & REPAIR |
AUXILIARY TRANSFORMER NO. 2 REMOVAL AND
REPLACEMENT PROCEDURE (CONTINUED)
REPLACEMENT PROCEDURE
1.Carefully place the transformer into the Power Wave 455/R.
2.Install the two mounting screws that hold the transformer to the machine base using the 3/8” nut driver.
3.Connect leads 33 and 32 to circuit breaker CB4 and the 115 V receptacle.
4.Connect plugs P50 and P52.
5.Reposition any wire leads and install cable ties as necessary.
6.Install the case back using the 3/8” nut driver.
7.Install the case top, sides, and input access panel using the 3/8” nut driver.