Palm m100 manual Checking off a To Do List item, Changing To Do List item details

Models: m100

1 219
Download 219 pages 2.76 Kb
Page 114
Image 114

To set the priority of a To Do List item:

1. Tap the Priority number on the left side of the To Do List item.

Tap here

Tap to select priority

2.Tap the Priority number that you want to set (1 is most important).

Checking off a To Do List item

You can check off a To Do List item to indicate that you’ve completed it. You can set the To Do List to record the date that you complete the To Do item, and you can choose to show or hide completed items. See “To Do Show Options” later in this chapter.

To check off a To Do List item:

Tap the check box on the left side of the item.

Completed

To Do item

Changing To Do List item details

The To Do Item Details dialog box enables you to change settings for individual items.

Page 107

Using Your Applications

Page 114
Image 114
Palm m100 manual Checking off a To Do List item, Changing To Do List item details