1000-A2-GN22-00

Index

 

 

indicators

alarm status 3-34APP 3-34

indicators. See status indicators inoperative fans 5-2installation

multiple units 3-7precautions 3-17

interface-specific connections B-2IP address 3-34

changing 3-35default 3-34

J

JetCraft terminals 3-34connecting to CPX-1000 3-34

L

labeling cables 3-26,3-30LAN hub 3-25

LAN routers 3-25LCC connector 3-17LCD connector 3-17

LED indicators, ACE module 2-33line cards, hot swap 5-11location guidelines 3-8

plant battery 3-18loopbacks 4-14

M

Management Processor Module controls, indicators, and ports 2-19generally 2-17

managing remote systems 3-25

monitoring internal operating parameters B-7mounting flanges, reversing 3-12

MP card, hot swap 5-10multiple units 3-7

N

NEBS, CPX-1000 meets requirements of D-1NEBS2000 racks 3-8,3-12

networks B-2

ATM connections 3-24

Ethernet LANs connections 3-25

host Class 5 connections 3-26,3-29,3-30troubleshooting Ethernet LANs 4-11verifying ATM connections 3-32verifying Ethernet LAN port operation 3-34

O

OC-3 ATM Module 2-33OC-3 cables 3-32

OC-3 port data transmission indicators 2-33Octal T1 Module 2-20

operating status 2-33

operating temperature and humidity 3-7operation alarms B-7

output alarm connections B-4,D-4

P

pin assignments

Ethernet connection B-4,B-8Ethernet LAN connections 3-25T1 module B-5,B-6,B-8

PING testing 3-34,3-35failed 4-11

plant battery connecting to 3-16requirements B-4

plug-in modules, indicator states 3-33ports, ACE module 2-33

power connections 3-16,3-17power sources 3-8

fans 3-34powering up 3-32precautions 3-5,5-3,5-7,5-8

PSTN Module, troubleshooting 4-9PWR indicator

troubleshooting 4-7,4-8

R

racks

Bell Narrow 3-8,3-12Bell Wide 3-8,3-12EIA310 3-8,3-12NEBS2000 3-8,3-12requirements 3-8

relay contact specifications (alarms) B-7

February 2003

I-3

Page 159
Image 159
Paradyne CPX-1000 manual 1000-A2-GN22-00 Index