Paradyne CPX-1000 manual Mount Splitter Assembly, Connect Plant Battery Frame Ground

Models: CPX-1000

1 160
Download 160 pages 36.84 Kb
Page 80
Image 80

3. Installing the CPX-1000

1000-A2-GN22-00

 

 

Mount the

Splitter

Assembly

Step 1

Step 2

Step 3

Step 4

Connect Plant

Battery and

Frame Ground

After you have installed the CPX shelves, install the STS-1 Splitter Assemblies if your CPX is configured for STS-1. .

Note

The Splitter Assembly is shipped with 75 ohm BNC terminators in place to prevent signal degradation. These caps should be left in place until an STS cable is connected, and should be replaced if the cable is removed.

If necessary, reverse the mounting flanges to fit your rack.

Place the Splitter Assembly into position above the CPX.

Using a slotted screwdriver, insert four 12-24 12-inch pan head screws to each flange to fasten the Splitter Assembly× to the rack.

Repeat these steps for each Splitter Assembly.

Power comes in to the CPX rear panel at the A and B plant battery power strips. The A and B power legs each may be connected to either of the power connection points on the back of the shelf.

Danger

The –48VDC plant battery presents a potentially fatal shock hazard. Use extreme caution when connecting it to the CPX and other equipment that requires plant battery for operation.

3-16

February 2003

Page 80
Image 80
Paradyne CPX-1000 manual Mount Splitter Assembly, Connect Plant Battery Frame Ground