3. Installing the CPX-1000

1000-A2-GN22-00

 

 

Verify Cabling

Before proceeding with the final tasks of CPX installation, take

 

 

time to check your cabling, by verifying the following:

 

Step 1

ATM cables: The fiber optic OC-3 Transmit and Receive cables

 

 

connect the ATM modules to the ATM network.

 

Step 2

Ethernet LAN Connection: The MP Transition card connects to

 

 

the MP LAN connection using straight-through cables. Also ensure

 

 

that the cable connects to the associated LAN port on the router.

 

Step 3

Host Switch T1 Cables: All T1 cables from the rear of the CPX

 

 

shelf are properly connected to the DSX. All connections should be

 

 

made from the RJ48C patch panel, which in turn is connected via

 

 

the 25-pair cable to the RJ-21X port on the 12-port T1 transition

 

 

modules of the CPX shelf.

 

Step 4

STS-1 Cables: The CPX is connected to the Class 5 switch via 2

 

 

STS-1 cables connected from the STS-1 Splitter Assembly, and each

 

 

STS-1 module in the CPX connects to the Splitter Assembly with

 

 

two cables—Transmit and Receive— in a matched manner.

 

 

 

Apply Power

After verifying CPX cabling, apply power to the CPX:

 

Step 1

Turn the circuit breaker on from the CPX rear panel.

 

Step 2

Verify that the CPX front panel POWER indicator is lit (directly

 

 

below the plug-in module cage).

 

Step 3

Verify that the INPUT indicators are lit on all power supplies.

 

Step 4

Verify that the fan in each power supply/fan module is running.

3-32

February 2003

Page 96
Image 96
Paradyne CPX-1000 manual Verify Cabling, Apply Power