Paradyne CPX-1000 manual Installation Checklist

Models: CPX-1000

1 160
Download 160 pages 36.84 Kb
Page 66
Image 66

3. Installing the CPX-1000

1000-A2-GN22-00

 

 

Installation Checklist

Photocopy or print these pages as quick reference to the steps required for successful installation and turn up.

￿

Task

Page Ref

 

 

 

￿

Prepare for Installation (safety information, site preparation)

3-5

 

 

 

￿

Unpack and inspect the CPX

3-10

 

 

 

￿

Inventory CPX components

3-11

 

 

 

￿

Attach mounting flanges

3-12

 

 

 

￿

Mount CPX in rack

3-13

 

(optionally mount Splitter Assembly)

3-16

 

 

 

￿

Connect plant battery and frame ground to CPX shelf

3-16

 

 

 

￿

Install modules (cards) in CPX

3-19

 

 

 

￿

Attach OC-3 ATM network cables

3-24

 

 

 

￿

Verify hardware installation, (power, ground, and cards)

3-23

 

 

 

￿

Attach Ethernet cables, MP to CP cards, and CPX to LAN

3-25

 

 

 

￿

Attach CP redundancy cable

3-25

 

 

 

￿

Connect CPX to Class 5 switch (Octal T1)

3-26

 

 

 

￿

Connect CPX to Class 5 switch (12-port T1)

3-28

 

 

 

￿

Attach STS-1 Cables

3-30

 

 

 

3-2

February 2003

Page 66
Image 66
Paradyne CPX-1000 manual Installation Checklist