1000-A2-GN22-00

3. Installing the CPX-1000

 

 

Check Plug-in

Module

Indicators

Step 1

Step 2

Step 3

After applying power, wait at least five minutes for the CPX to initialize. Then, check the indicators on the modules to verify that the modules are powered as described in the sections that follow.

If the indicator states are incorrect on any module, refer to the Service manual for corrective action.

Call Processor (CP) Indicator: Verify that the BFL indicator is not lit. The CPU, CPCI and PCI and ETH indicators light with activity.

Hot Swap Card (HSC) Indicator: Verify that the PWR indicator is lit to indicate that the CP and HSC cards are powered, and the ERROR indicator is off.

Management Processor (MP) Indicators: Verify that the PWR indicator is lit, and the Link indicator is lit to show that a communication link is established with the CP card. The ACT indicator lights when the module is in use.

Step 4

ATM Module OC-3 Indicators: Verify that the STATUS

 

indicator blinks to indicate heartbeat is present. (STATUS lights

 

solid when there is a problem). The Tx and Rx indicators will light

 

when data transmission and reception occurs.

Step 5

Octal T1 Module: Verify that the green RUN indicator is lit, and

 

the FAIL indicator is off. Each port indicator light should be off.

 

They light when carrier fails, or no carrier is present. The blue Hot

 

Swap indicator should also be off. The Power indicator on the

 

corresponding transition card should be lit.

Step 6

12-port T1 ECAC Module: Verify that the green RUN indicator

 

is lit, and the FAIL indicator is off. Each port indicator light should

 

be off. They light when carrier fails, or no carrier is present. The

 

blue Hot Swap indicator should also be off. The Power indicator on

 

the corresponding transition card should be lit.

Step 7

STS-1 Module Indicators: Verify that the STAT and ACT

 

indicators are lit, and TX and RX light green during data

 

transmission/reception. The Hot Swap indicator should be out.

Step 8

STS-1 ECAC Module Indicators: Verify that the STAT and ACT

 

indicators are lit, and TX and RX light green during data

 

transmission/reception. The Hot Swap indicator should be out.

February 2003

3-33

Page 97
Image 97
Paradyne CPX-1000 manual Check Plug-in Module Indicators, ATM Module OC-3 Indicators Verify that the Status