3. Installing the CPX-1000

1000-A2-GN22-00

 

 

Turn-up Checklist

Use this checklist when Provisioning and turning up the CPX. For these steps, work from facilities and deployment information provided by your network operating center to establish service and manage of the CPX. Use the Jetstream software tools where specified.

￿

Task

 

 

￿

Verify data fill settings and obtain provisioning settings from switch personnel

 

(as appropriate).

￿Check the bit error rate (BER) on every GR-303 PSTN line.

￿Using Console, perform a stats command on everything. Refer to Appendix A, Using the Console.

￿Use JetCraft and JetStat to monitor the CPX and its associated IADs. Refer to the JetCraft User’s Guide for more information.

￿Ensure that no cells are being dropped in the DSLAM or ATM switch.

￿Ensure voice is given priority on the DSLAM if QoS is available on the

DSLAM.

Record any discrepancies and corrective actions taken: (Briefly describe below)

3-4

February 2003

Page 68
Image 68
Paradyne CPX-1000 manual Turn-up Checklist, Check the bit error rate BER on every GR-303 Pstn line