3. Installing the CPX-1000

1000-A2-GN22-00

 

 

Unpack and

Inspect the

CPX-1000

Before unpacking your CPX, site preparation should be complete, including installation of the rack, and network cabling ready for connection.

Before accepting delivery of the CPX, you should inspect the containers and the unit.

1

2

3

4

5

 

 

 

 

 

6

7

8

1

2

3

 

 

 

 

 

4

5

 

 

 

 

 

 

 

6

7

9

8

10

9

11

10

12

13

11

12

14

13

15

14

 

0088b

Step 1

Inspect the shipping container for damage.

Step 2

Cut the shipping bands and remove the top of the box.

3-10

February 2003

Page 74
Image 74
Paradyne manual Unpack Inspect CPX-1000, Cut the shipping bands and remove the top of the box