7.2Setting the operation mode

Applied operation can be performed by selecting the operation mode. To set the operation mode, use the basic parameter EOQF (command mode selection) and the input terminal selection parameter.

(1) Operation panel operation

(2) Terminal board operation

F

R

S1

S2

RUN

P5

STOP

P15

VI/S3

CC

EOQF (Operation panel)

(3) Operation panel/terminal board switching

F

R

S1

S2

RUN

P5

STOP

P15

VI/S3

CC

EOQF (Terminal block)

(4) Operation from an external input device

7

F

R

S1(PNL/TB)

S2

RUN

P5

STOP

P15

VI/S3

CC

EOQF (Operation panel)

H (Panel/terminal board switching) Switching from panel operation to terminal board operation is done by inputting a panel/terminal board switching signal.

F

R

S1

S2

RUN

P5

STOP

P15

VI/S3

CC

Optional connector

Priority is given to the external input device when the communications function is so set.