Multi-Function Board, 2-8number required, 2-8requirements, 2-2

Slot restrictions, 2-8Software, 1-4

Solving terminal connection problems, D-3Supported equipment, 2-6

Switch

cycling power, 1-5,2-8DC-powered, 2-10

Switch carrier

inserting system assembly in, 1-5,2-7System

assembly, 1-2hardware, 1-2registering, 2-41requirements, 2-2security, 1-5states, 2-13upgrade, 1-5

System assembly, 1-1connecting, 2-4

in carrier, 1-5,2-7inserting in cabinet, 2-10inserting in existing switch, 2-13installation, 2-7

installing, 2-7System boot

automatic, 2-11System clock

setting, 2-32

System Logs screen, 3-42

T

Tape cartridge, 2-42TCP/IP, 1-4

TCP/IP Administration (Main Menu) screen, 3-15Temperature requirements

for installation, 2-2Terminal

administration/maintenance, 2-17connecting, 2-17

installing, 2-7optional, 2-17

setting options for, 2-20Terminal emulation packages, 2-17Terminal (G3-MT), 2-27

Testing harware, 2-7

This Host screen, 2-33,3-16TN2170 (Alarm Board), 1-2TN2208 (Multi-Function Board), 1-2

Toll fraud, 1-5,1-6

Tools required for installation, 2-1,2-3Transport

Ethernet vs. BRI, 1-1

TSC, See Technical Service Center

V

Verifying components, 2-4

Verifying connectivity, 2-4

Verifying site selection, 2-1

W

Workspace requirements, 2-2

IN-4

Page 166
Image 166
AT&T 555-230-223 manual IN-4