Index
104A connecting block, 2-15
10BaseT Ethernet, 1-1
116A, 2-20
in DC-powered switch, 2-10
A
Adapter
faceplate, 2-13
Adapter cables, 2-7
Add Client Link screen, 3-33
Add Host screen, 3-20
Add Logins screen, 3-11
Add Routes screen, 3-29
Administration
requirements, 1-1
Administration methods, 1-2
Administration/maintenance terminal, 2-17
ADUs,
See
Asynchronous Data Units
Alarm Board, 2-10
Alarm board
cables, 2-14
Alarm Board
cables
connecting, 2-7
slot, 2-8
Alarms on LCD, 2-12
ALB,
See
Alarm Board
Asynchronous Data Units, 2-17
AT&T services personnel, 2-1, 2-17
Audit trail
and system security, 1-5
Automatic system boot, 2-11
B
BRI transport, 1-1
Bringing up the system, D-2
Brouter, 1-1, 1-4
Brouter Administration screen, 3-31
C
Cable
group 300, 2-15
group 311, 2-20
Cable requirements
for installation, 2-2
Cables, 1-5, 2-9
adaper, 2-7
alarm board, 2-14
Carrier
insertion of system assembly, 1-5
Carrier restrictions, 2-8
Change Passwords screen, 3-13
Circuit packs, 1-4
Client Access Logs screen, 3-45
Command Logs screen, 3-47
Components
verifying, 2-1
Connecting
terminals, 2-17
Connecting block
104A, 2-15
Connecting the
Alarm Board cables, 2-7
Connecting the system assembly, 2-4
Connections
external, 2-4
Connectors
port, 1-5
Customer options form, 2-3
D
DC-powered switch, 2-10
Default Gateway screen, 3-25
Default passwords, 1-5
DEFINITY
customer options form, 2-3
switch requirements, 2-2
DEFINITY AUDIX
circuit packs, 1-4
system assembly, 1-3
DEFINITY LAN Gateway
placement in switch carrier, 2-2

IN-1