Task 13: Test LAN/Client Connectivity (Optional)

Task 13 is performed to test the TCP/IP connection to ensure that connectivity exists between the DEFINITY LAN Gateway and the customer’s LAN, as well as between the DEFINITY LAN Gateway and a client. This testing should be done jointly with the customer’s LAN administrator.

NOTE:

Connectivity to the DEFINITY LAN Gateway system from a subscriber PC is not part of the acceptance testing for this feature. Customers are responsible for verifying that their LAN is communicating with the subscriber PCs.

Requirements

Login:

craft

Suggested

Configuration diagram (see

Materials:

Appendix E)

Special

The ASAI-Ethernet TCP/IP has

Condition:

been administered and the

 

system has been rebooted.

1.The preferred option is to have the customer’s LAN administrator perform a standard LAN ping test into the DEFINITY LAN Gateway using the addressing information previously provided in Task 10. If the customer is unavailable to perform this test, go to step 2.

2.Perform the following steps only if the customer is unavailable for acceptance testing. (However, step 1 above, Joint Testing, is the preferred testing method.)

a.Access the DEFINITY LAN Gateway Main Menu. Select Maintenance and then Ping Host . The Ping Host screen follows.

2-36Issue 1 January 1996

Page 55
Image 55
AT&T 555-230-223 manual Task 13 Test LAN/Client Connectivity Optional, Requirements