
Chapter 2 Installing the Cisco ONS 15501
DC Power Connection
Warning When installing or replacing the unit, the ground connection must always be made first and disconnected last.
Grounding the Chassis
To connect the provided grounding lug to the tapped frame grounding holes and connect the
Step 1 Verify that the primary and
Step 2 Remove the cover from the DC power terminal connectors. Identify the two tapped frame grounding holes at the upper right side of the Cisco ONS 15501 front panel. (See Figure
Step 3 Remove the two screws provided for securing the ground lug to the Cisco ONS 15501.
Step 4 Connect the 8 AWG grounding wire to the grounding lug. The other end of the wire should be suitably grounded.
Step 5 Install the grounding lug on the Cisco ONS 15501, using the two provided screws and washers.
Step 6 Test for proper frame ground using the ohmmeter section of a digital voltmeter. Place one prod on the Cisco ONS 15501 and the other on the frame grounding bus to which the grounding lug and grounding wire is connected. Observe for a
Note There is an alternate grounding point on the chassis, located on the left side of the rear panel.
Connecting the Power
To connect the power wiring to the DC power terminal connectors, follow these steps:
Step 1 Cut and strip the
Step 2 Install the primary DC power wiring to the
Step 3 Install the redundant DC power wiring to the
Step 4 Replace the power connector cover.
Step 5 Apply power to the primary and redundant DC circuits.
|
| Cisco ONS 15501 User Guide |
|
| |
|
|
| |||
|
|
|
|
| |
|
|
|
|