Chapter 2 Installing the Cisco ONS 15501

Required Tools and Parts

Use the site log as a record of ongoing system maintenance. Each time a procedure is performed on the Cisco ONS 15501, update the site log to reflect situations such as maintenance schedules and requirements, intermittent problems, changes and updates, configuration changes, and related comments and notes.

Required Tools and Parts

You need the following tools and parts to install the Cisco ONS 15501:

Phillips screwdriver

Wire cutters, as needed (for DC power wiring)

Wire strippers, as needed (for DC power wiring)

Crimp tool (for grounding wire)

Digital voltmeter (with ohmmeter function)

Grounding wire (8 AWG)

Power supply connection wire (18 AWG)

Listed two-hole copper grounding lug (0.25 in. [0.635 cm] diameter bolt hole size, 0.625 in. [1.5875 cm] center-to-center hole spacing)

Installation Checklist

The installation checklist includes the procedures for initial hardware installation of the

Cisco ONS 15501. Mark the entries as you complete each procedure. Make a copy of this checklist, as needed, for the site log.

Installation checklist for site:

Product name:

Task

Verified By

Date

 

 

 

Background information placed in site log

 

 

 

 

 

Cisco printed documentation received

 

 

 

 

 

Cisco ONS 15501 received

 

 

 

 

 

Accessories received

 

 

 

 

 

Required tools available

 

 

 

 

 

Additional equipment available

 

 

 

 

 

Site power voltages verified

 

 

 

 

 

Initial electrical connections established

 

 

 

 

 

Cisco ONS 15501 fully installed

 

 

 

 

 

Operation verified

 

 

 

 

 

 