lers)

Enter the number of Echelon devices you wish to add on the Connected I/O screen:

Figure 8-5- Connected/IO Setup Screen (RX Unit Shown)

Navigate to the Open Echelon field under the Third Party Tab section of the Connected I/O setup screen and enter the number of Echelon devices to be added.

Next, commission the Echelon device. Commissioning is done at the Controller Setup screen. If still on the Con- nected I/O screen, hit the back button to go back to the

Network setup menu and select (Controller Setup). Or, from the Main Menu:

1.Select (System Configuration)

2.Select (Network Setup)

3.Select (Network Summary)

Commission the device on the Network Summary screen:

Highlight the LonMark device on the screen you wish to commission and follow the steps in Section 10.14.2, Commissioning a Device to commission the device.

8.8.1.1Troubleshooting

After commissioning has been completed, check to make sure the device has been added successfully. From

the Main Menu, select (Configured Applications) to

open the Configured Applications list. If the device you have commissioned does not appear in this list, the Description File has failed to upload correctly onto the E2. An alarm of No Description File will be generated and can be found in the Alarm Advisory Log. Call Emerson Retail Solutions at 770-425-2724to contact your sales rep- resentative or technical assistance to obtain the Descrip- tion File.

Figure 8-6- Network Summary Screen (RX Unit Shown)

Open Echelon Device Connectivity

Echelon Network and Hardware Setup 8-5

Page 91
Image 91
Emerson E2 operation manual Troubleshooting, Connected/IO Setup Screen RX Unit Shown