7. Other Functions

7.3 Event Scheduling

The scheduling function enables to setup scheduled events including power on / power off. It enables to be “self-management” projector.

NOTE • You can schedule the following control events: Power, Input Source, My Image, Messenger, Slideshow. (56)

The power on / off event has the lowest priority among the all events that are dened at the same time.

There are 3 types of Scheduling, 1) daily 2) weekly 3) specic date. (55)

The priority for scheduled events is as follows 1) specic date 2) weekly 3) daily.

Up to ve specic dates are available for scheduled events. Priority is given to

those with the lower numbers when more than one event has been scheduled for the same date and time (e.g., ‘Specic date No. 1’ has priority over ‘Specic date No. 2’ and so on.

Be sure to set the date and time before enabling scheduled events. (58)

81

Page 194
Image 194
Hitachi ED-A220N user manual Event Scheduling