Hitachi J300U Series Megohm-meter, Earth leakage breaker Mgo, Turn on and OFF Good example

Models: J300U Series

1 145
Download 145 pages 53.04 Kb
Page 13
Image 13

6.Others

WARNING

*Never modify the unit.

Otherwise, there is a danger of electric shock and/or injury.

CAUTION

*Withstand voltage tests and insulation resistance tests (megger tests) are executed before the units are shipped, so that there is no need to conduct these tests before operation.

When conducting megger tests as a part of daily inspection, be sure that these tests are only executed between the main circuit and the ground. Do not execute megger tests on the control circuit.

(L1)

(L2)

(L3) (RB)

(+)

(–)

(T1)

(T2)

(T3)

R

S

T RB

P

N

U

V

W

FM

P24

PLC

FW

• • •

Megohm-meter

Megohm-meter

*Do not attach or remove wiring or connectors (including Digital operator and Remote operator) when power is applied. Also, do not check signals during operation. Otherwise, a trip may occur or a failure may be caused. To stop the operation, be sure to use an operation instruction (FW,REV.) Do not turn power off within three minutes after it is turned on, or vice versa.

*Do not stop operation by switching off the electromagnetic(Mgo) contactors on the primary or secondary sides of the inverter.To stop the operation, be sure to use an operation instruction (FW,REV.) Do not turn power off within three

minutes after it is turned on, or vice versa.

(Bad example)

Power supply

Earth leakage breaker

 

Mgo

 

ON,OFF

 

ON,OFF

 

 

(L1) (L2) (L3)

 

(T1) (T2) (T3)

 

R , S , T

U , V , W

Motor

 

 

 

FW

 

 

INV

 

 

 

PV24

Turn ON and OFF (Good example)

When there has been an instantaneous power failure, and if an operation instruction has been given, then the unit may restart operation after the power failure has ended. If there is a possibility that such an occurrence may harm humans, then install an electromagnetic contactor (Mgo) on the power supply side, so that the circuit does not allow automatic restarting after the power supply recovers. If the optional remote operator is used and the retry function has been selected, this will also cause automatic restarting when an operation instruction has been input, so please be careful.

1-7

Page 13
Image 13
Hitachi J300U Series instruction manual Megohm-meter, Earth leakage breaker Mgo, Turn on and OFF Good example