Index

Installation Options 2–3

Installation Task Summary (table) 2–1installation tasks

backing-up configuration data 2–51cabling Fibre Channel ports 2–69configuring

network addresses 2–6

product manager application 2–23switch from EWS 2–51

switch to the HAFM Application 2–13configuring OSMS or FICON management

server 2–19

configuring the feature key 2–15connecting switch to fabric director 2–69LAN-connecting the switch 2–11recording and verifying HAFM Server

restoration information 2–13setting switch date and time 2–21setting up the HAFM server 2–12summary 2–1

testing remote notification 2–50unpacking, inspecting, and installing

Ethernet hub 2–71switch 2–4

verify installation requirements 2–3verifying switch-to-HAFM server

communication 2–14interop mode 2–32

IP address configuring 2–6default B–1default value B–2

L

LAN

connector 1–8

LAN, connecting the switch 2–11laser

devices A–6information A–9

LEDs

fan 1–9

FRU status 1–9port SFPs 1–9power supply 1–9PWR LED 1–9

LIN alerts, default values B–2logs, introduction 1–3

M

MAC address, default B–2MAC addresses 2–6maintenance port 1–3,1–9management

switch 1–5

management server, default values B–3mode

interop 2–32

open fabric 1.0 2–32open systems 2–29operating 2–28S/390 2–28

multiswitch fabric 1–5e_d_tov 2–31principal switch 2–31rerouting delay 2–27

N

network addresses, configuring 2–6network information, configuring from EWS

2–62notebook PC 1–10

NV-RAM 2–25,2–29

O

open fabric 1.0 2–32

open systems mode 2–28,2–29operating mode 2–28

operating parameters, default values B–2

P

password, default B–1PCMCIA slots 1–11

personal computer, HAFM server 1–10port addresses, default value B–2