Installing and Configuring the Edge Switch 2/32
Installation Options
The switch is installed in one of two configurations. The options are:
•Table or desk
•
Task 1: Verify Installation Requirements
Verify the following requirements are met prior to switch and HAFM server installation. Ensure:
•A site plan is prepared, configuration planning tasks are complete, planning considerations are evaluated, and related planning checklists are complete. Fabric and device connectivity are evaluated, and the related planning worksheet is complete. Refer to the hp StorageWorks product in a SAN environment: planning guide for director 2/64, edge switch 2/16, and edge switch 2/32.
•Support equipment and personnel are available for the installation.
•The required number and type of
•A
•Remote workstations or simple network management protocol (SNMP) workstations are available (optional). Workstations are
edge switch 2/32 installation guide |