Installing and Configuring the Edge Switch 2/32

4.Verify that the SFP optical transceivers are installed as required for your installation.

5.Connect the U.S. or country-specific (optional) AC power cords to the right (PS0) and left (PS1) receptacles at the rear of the chassis.

WARNING: An HP-supplied power cord is provided for each switch power supply. To prevent electric shock when connecting the switch to primary facility power, use only the supplied power cords, and ensure the facility power receptacle is the correct type, supplies the required voltage, and is properly grounded.

6.Connect the remaining ends of the AC power cords to separate facility power sources that provide single-phase, 120 to 240 volt alternating current (VAC) current. This provides power redundancy.

7.Turn on the power. Two power switches are on the back of the unit. Turn on both switches. The unit powers on and performs power-on self-tests (POSTs). During POSTs:

a.The green power (PWR) LED on the front panel turns On.

b.The amber system error (ERR) LED on the front panel flashes momentarily while the switch is tested.

c.The green LEDs associated with the Ethernet port flashes momentarily while the port is tested.

d.The green and amber LEDs associated with the ports flash momentarily while the ports are tested.

8.After successful POST completion, the green power (PWR) LED remains ON and all other front panel LEDs turn OFF.

9.If a POST error or other malfunction occurs, refer to the hp StorageWorks edge switch 2/32 service manual to isolate the problem.

Rack-Mount Installation

To install the switch in a customer-supplied equipment rack, refer to the hp StorageWorks edge switch rack mount kit installation instructions. The installation instructions are located on the hp StorageWorks edge switch 2/32 documentation CD.