Addendum to the ProCurve Access Control Security Design Guide
Updating the Access Control Design Process
Table
Interoperability | Option |
Requirements |
|
|
|
Legacy and future | NAC 800 |
products |
|
Windows 2008 | NAP |
services only |
|
|
|
Examples. NAP is for companies that want the complete NAP solution. PCU is not ready to complete an extensive upgrade. It selects the NAC 800.
ProCurve, Inc. has already completed its upgrade and wants to use a Windows- based security solution. And since the company is using primarily Windows solutions, it does not have to worry about the
Bringing the Factors Together
As you consider each factor, you should record the decision you would make based on that factor in a table such as Table
Table
Factor | Weight | Selection |
|
|
|
Existing network infrastructure
Vulnerability to risks and risk tolerance
Management resources
Interoperability requirements
Total
Examples. PCU network administrators compiled their choices in Table