| Operating the Library |
| |
| Running an Internal Test |
| |
Table | Internal Tests |
| |
|
|
|
|
Test Name | Description |
|
|
|
|
|
|
EXERCISE MECH | Runs the VERTICAL TEST, TRANSLATE TEST, MAGAZINE IO, and DRIVE |
|
|
| IO tests. Each test is run one time per test loop. |
|
|
|
|
|
|
EXCHANGE DEMO | Used by service personnel only. Do not run this test if the library contains |
|
|
| tape cartridges with file system data on them. This test moves randomly |
|
|
| chosen cartridges to random storage slot locations. This test displays FAIL if |
|
|
| there are no cartridges in the library or if all storage slots are full. For best results, |
|
|
| the library should contain as many cartridges as there are drives, plus two |
|
|
|
| ||
| additional cartridges. The transport must be empty. |
| Library |
|
|
| |
IO DRIVE | Makes a combination of moves with a PASS/FAIL result. If the drives are |
| |
|
| ||
| empty, a tape cartridge is moved from a randomly chosen full slot to a randomly |
| Operation |
| chosen drive. If the drives are full, a tape cartridge is moved from a randomly |
| |
|
|
| |
| chosen drive to a randomly chosen storage slot. It then moves the cartridge back |
|
|
| to its original location. This test displays FAIL if there are no cartridges in the |
|
|
| library or if all storage slots are full. The transport and the mailslot must be |
|
|
| empty. |
|
|
|
|
|
|
IO MAGAZINE | Makes a combination of moves with a PASS/FAIL result. It moves a tape |
|
|
| cartridge from a random full slot to a random empty slot. It then moves the tape |
|
|
| cartridge back to its original storage slot. This test displays FAIL if there are no |
|
|
| cartridges in the library or if all storage slots are full. The drives, transport, and |
|
|
| the mailslot must be empty. |
|
|
|
|
|
|
IO MAILSLOT | Makes a combination of moves with a PASS/FAIL result. It moves a tape |
|
|
| cartridge from a random full slot to the mailslot. It then moves the tape cartridge |
|
|
| back to its original storage slot. This test displays FAIL if there are no cartridges |
|
|
| in the library or if all storage slots are full. The drives, transport, and the mailslot |
|
|
| must be empty. |
|
|
|
|
|
|
INVENTORY | Functions the same as the SCSI Initialize Element Status command. This test |
|
|
CHECK | physically scans the entire unit to determine which storage slots contain tape |
|
|
| cartridges and if the drives contain cartridges. NOTE: This test will appear as |
|
|
| ISTAT TEST in all front panel error messages. |
|
|
|
|
|
|
TEST | Translates from side to side. No tape cartridges are required. |
|
|
TRANSLATE |
|
|
|
|
|
|
|
TEST VERTICAL | Moves the transport mechanism up and down the full length of the rail. Returns |
|
|
| PASS/FAIL. No tape cartridges are required. |
|
|
|
|
|
|