Croma24 Service Manual

7.Insert the Strain Relief (with Trailing Cable) onto the Carrier Assembly by sliding it onto the Strain Relief Support until it snaps firmly into place. See Figure 5-4.

Replacing the Carrier Bushings

1.Perform the Carrier Assembly, Carrier Belt, and the Frame Tensioner Removal procedures to remove the Carrier Assembly from the Slide Shaft.

Figure 5-11. Carrier Bushing Removal.

2.Use a flat tip screwdriver to push up on the latch which holds the Carrier Bushing in place. See Figure 5-11.

3.Pull the Carrier Bushing out of the Carrier Assembly.

4.Repeat Steps 2 and 3 for the other Carrier Bushing.

108 Assembly\Disassembly

Page 108
Image 108
Integra CROMA24 service manual Replacing the Carrier Bushings, Carrier Bushing Removal