
Croma24 Service Manual
6.Route the Stepper Motor ground strap through the wire access area and to the wire clamp. Attach onto the back of the MPCB.
7.Carefully snap the Platen onto the printer Base. Ensure that the ground straps for the Slide Shaft and
8.Secure the Lower Roller Assembly onto the Platen.
9.Attach the
10.Attach the Slide Shaft to the supports tightening to 15
11.Attach the ground strap to the left side of the Slide Shaft.
12.Perform the Carrier Assembly, Carrier Belt, and the Frame Tensioner Reinstallation procedures to reinstall the Carrier Assembly.
Remove the Power Supply and AC Entry Module
1.Remove the Left, Middle, and Right covers by following the cover removal procedures.
2.Remove the Cutter Actuator by reaching under the Platen and releasing the actuator tabs.
3.Release the Carrier Belt from the servo Motor spindle by pressing the tension assembly inward to allow enough slack to lift off the belt from the servo motor.
4.Disengage the Trailing Cable from the Carrier Assembly by disconnecting the cable from J1 on the Carrier Board and pressing on the Trailing Cable Strain Relief latch (see Figure 5- 4).
5.Slide the Carrier Assembly, Belt and Tension Assembly off the left side of the Slide Shaft.
DISASSEMBLY | ASSEMBLY/ |
|
|