Reported Event

Corrective Action

 

 

PDM

 

 

 

PDM is started

Result of settings or user action. Normal.

 

 

PDM is completed

Normal.

 

 

PDM is paused

PDM paused because of user intervention, schedule

 

or a higher priority background activity.

 

 

PDM is resumed

PDM has resumed again after a pause.

 

 

PDM is stopped

PDM stopped because of user intervention, schedule

 

or the logical drive was deleted or went critical or

 

offline.

 

 

PDM is switched to

PDM changed to rebuild because the logical drive

rebuild.

went critical

 

 

PDM is stopped internally

The destination drive was removed or used for a

 

rebuild.

 

 

 

(PDM Events)

SECURSTOR ASTRA ES

119

Page 119
Image 119
Meridian Data manual 119, PDM Events, Reported Event Corrective Action