Reported Event

Corrective Action

 

 

Redundancy Check

 

 

 

Redundancy Check is

Redundancy Check has started manually or by

started

schedule.

 

 

Redundancy Check is

Redundancy Check has finished.

completed

 

 

 

Redundancy Check is

Redundancy Check paused because of user

paused

intervention, schedule or a higher priority

 

background activity.

 

 

Redundancy Check is

Redundancy Check has resumed again after a

resumed

pause.

 

 

Redundancy Check is

Redundancy Check stopped because of user

stopped

intervention, schedule or the logical drive was

 

deleted or went critical or offline.

 

 

Redundancy Check is

System resources are low. Reduce system load or

aborted due to internal

restart the Astra ES.

error

 

 

 

Redundancy Check

Check the logical drive’s inconsistent block table.

encountered inconsistent

Rebuild the disk array if necessary.

block(s)

 

 

 

Redundancy Check task

Redundancy Check has been set manually or by

is queued

schedule.

 

 

Redundancy Check task

The logical drive is offline.

is stopped internally

 

 

 

(Redundancy Check Events)

Reported Event

Corrective Action

Resource

Resource is NOT available

System resources are low. Reduce system load or restart the Astra ES.

(Resource Events)

126

EXCEL MERIDIAN DATA

Page 126
Image 126
Meridian Data manual 126, Redundancy Check Events, Resource Events, Reported Event Corrective Action Redundancy Check