9LOADING AND INSTALLATION
(2)Wiring of I/O equipment
(a)
(b)The wires used for connection to the terminal block should be 0.3 to 0.75mm2 in core and 2.8mm (0.11 inch) max. in outside diameter.
(c)Run the input and output lines away from each other.
(d)When the wiring cannot be run away from the main circuit and power lines, use a
In some cases, ground it in the opposite side.
PLC | Shielded cable | ||||||||||||||||
| |||||||||||||||||
Input |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RA
OutputShield
DC
(e)Where wiring runs through piping, ground the piping without fail.
(f)Run the 24VDC input line away from the 100VAC and 200VAC lines.
(g)Wiring of 200m (686.67 ft.) or longer distance will give rise to leakage currents due to the line capacity, resulting in a fault.
Refer to Section 11.5 for details.
(3) Grounding
To ground the cable, follow the steps (a) to (c) shown below.
(a)Use the dedicated grounding as far as possible.
(b)When a dedicated grounding cannot be performed, use (2) Common Grounding shown below.
PLC | Another | PLC |
|
| Another | PLC | Another | |||||||||||||
equipment |
|
| equipment | equipment | ||||||||||||||||
|
|
|
|
|
|
|
|
|
| |||||||||||
|
|
|
|
|
| grounding |
|
| grounding |
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
(1) Independent grounding..... | Best (2) Common grounding Good..... | .....(3) Joint grounding Not allowed |
(c)For grounding a cable, use the cable of 2 mm2 or more.
Position the
9 - 25 | 9 - 25 |