See “Meter mounting” on page 18 and “Meter wiring” on page 19 for additional information.

Installing the terminal covers

The voltage and current terminal covers help prevent tampering with the meter’s voltage and current measurement inputs. The terminal covers enclose the terminals, the conductor fixing screws and a suitable length of the external conductors and their insulation. The terminal covers are secured by tamper-resistant meter seals.

The meter terminal covers must be installed by a qualified installer. The installation of both the voltage and current terminal covers is required to provide tamper evidence for MID installations.

Location of terminal covers

A

B

C

D

AVoltage terminal cover

BVoltage terminal sealing point

CCurrent terminal cover

DCurrent terminal sealing point

1.Install the voltage terminal cover (A) and apply the seal at the sealing point (B).

2.Install the current terminal cover (C) and apply the seal at the sealing point (D).

PM5331/PM5341 default screen

The meter’s default home screen displays the following information.

Default PM5331/PM5341 display screen

E

D

C B

AAccumulated real energy (delivered + received)

BActive tariff

CSystem frequency

DPower system setting

ELocked / unlocked icon