Model SB1016/SB1036 | P R E P A R A T I O N | For Machines Mfg. Since 7/09 |
Unpacking |
| |
This item was carefully packaged to prevent |
| |
damage during transport. If you discover any |
| |
damage, please immediately call Customer |
| |
Service at (360) | ||
need to file a freight claim, so save the containers | ||
and all packing materials for possible inspection | ||
by the carrier or its agent. |
| |
Inventory |
| |
Main Inventory 1: (Figure 6) | Qty | |
A. | Steady Rest Assembly | 1 |
B. | 1 | |
C. | 15" Faceplate | 1 |
D. | 12" | 1 |
E. | 14" | 1 |
F. | 1 | |
G. | Follow Rest Assembly | 1 |
Tool Box Inventory: (Figure 7) | Qty | |
H. | Tool Box | 1 |
I. | 1 | |
J. | Tool Post | 1 |
K. | Hex Wrench Set | 1 |
L. | Handwheel Handles | 2 |
M. | Solid Dead Center MT#5 | 1 |
N. | 1 | |
O. | Spindle Sleeve | 1 |
P. | Open End Wrench 10/12mm | 1 |
Q. | Open End Wrench 14/17mm | 1 |
R. | Open End Wrench 22/24mm | 1 |
S. | Combo Wrench 27mm | 1 |
T. | Phillips Screwdriver #2 | 1 |
U. | Standard Screwdriver #2 | 1 |
V. | ID Clamping Jaw Set (Three Jaw Chuck) | .... 1 |
W. | Cast Iron Leveling Pads | 8 |
Note: Some inventory components may be shipped inside of the lathe electrical box. These items MUST be removed before connecting the lathe to the power source.
AC
B
F
ED
G
Figure 6. Main inventory.
HR S
QT
P
U
O
M NV
I
L
JW K