Toro 4100-D service manual Cutting deck wire harness connection

Models: 4100-D

1 298
Download 298 pages 42.12 Kb
Page 262
Image 262

NOTE: Installation of clevis pins to deck and height--of-- cut chains is easier if deck is lifted slightly.

4.Install clevis pins and hairpins that secure the height--of--cut chains to the rear of the cutting deck (Fig. 2).

5.Remove plugs from hydraulic hoses and fittings on wing deck lift cylinders. Attach hydraulic hoses to lift cyl- inders.

6.Connect cutting deck wire harness to main machine wire harness (Fig. 5).

7.Position dampers to lift arms. Install clevis pins and hairpins to secure dampers to lift arms (Fig. 3).

8.Install any removed cutting deck covers.

9.Install hydraulic motors to cutting deck (see Cutting Deck Motor Installation in the Service and Repairs Sec- tion of Chapter 4 -- Hydraulic System).

10.Lubricate grease fittings on cutting deck and lift as- semblies.

11. Fill reservoir with hydraulic fluid as required.

1

Figure 5

1. Cutting deck wire harness connection

Cutting Deck

Page 8 -- 8

Groundsmaster 4100--D

Page 262
Image 262
Toro 4100-D service manual Cutting deck wire harness connection