Toro 4100-D service manual Cutting Deck Link Service, 5 6 7

Models: 4100-D

1 298
Download 298 pages 42.12 Kb
Page 267
Image 267

Cutting Deck Link Service

Disassembly (Fig. 10)

1.Press bushings from top of link.

2.Remove dust cap and retaining ring from link.

3.Press tapered stud with spherical bearing, flat wash- ers and flange nut from link.

4.Remove flange nut and press spherical bearing from tapered stud.

Assembly (Fig. 10)

1.Install new spherical bearing onto tapered stud. Se- cure bearing with flange nut. Torque nut from 30 to 40 ft--lb (41 to 54 N--m).

2.Position flat washer in both sides of spherical bear- ing.

3.Press tapered stud with spherical bearing, flat wash- ers and flange nut into link. Secure spherical bearing into link with retaining ring.

4.Press bushings into top bore of link.

5.If cap screw and jam nut were removed from rear link, install cap screw to allow 1.625” (41.3 mm) between the head of the screw and the side of the link (Fig. 11).

6.After link is installed on deck, check distance be- tween center deck blade and wing deck blade. Readjust cap screw and jam nut on rear link if needed (see Wing Deck Service in this Chapter).

 

 

30 to 40 ft--lb

1

2

(41 to 54 N--m)

3 4 5 6 7 8

Figure 10

1.

Link

5.

Flat washer (2 used)

2.

Bushing (2 used)

6.

Retaining ring

3.

Tapered stud

7.

Flange nut

4.

Spherical bearing

8.

Dust cap

 

 

1.625”

 

1

(41.3 mm)

 

 

 

 

2

 

 

3

 

 

Figure 11

1.

Rear link

3. Hex jam nut

2.

Cap screw

 

Cutting Deck

Groundsmaster 4100--D

Page 8 -- 13

Cutting Deck

Page 267
Image 267
Toro 4100-D service manual Cutting Deck Link Service, 5 6 7