Toshiba RAV-SM564SDT-E, RAV-SP804ATZG-E Detachment, Attachment, Part name, Procedure, Remarks

Models: RAV-SM564SDT-E RAV-SM454SDT-E RAV-SP404ATZ-E RAV-SP404ATZG-E RAV-SP404AT-E RAV-SP454ATZ-E RAV-SP454ATZG-E RAV-SP564AT-E RAV-SP454AT-E RAV-SP564ATZG-E RAV-SP564ATZ-E RAV-SP804AT-E RAV-SP804ATZ-E RAV-SP804ATZG-E

1 177
Download 177 pages 27.24 Kb
Page 153
Image 153

No.

Part name

Procedure

Remarks

 

 

 

 

9

Pulse Motor Valve

1. Detachment

 

 

(PMV) coil

1) Perform works of items 1 and

2 .

 

 

2)Release the coil from the concavity by turning it, and remove coil from the PMV.

2.Attachment

1) Put the coil deep into the bottom posi- tion.

2)Fix the coil firmly by turning it to the concavity.

PMV coil

10 Fan guard

1. Detachment

1) Perform works of items 1 of 1 and 2 .

Minus screwdriver

2)Remove the front cabinet, and put it down so that fan guard side directs

downward.

 

 

CAUTION

 

 

 

 

 

 

 

 

 

 

Perform works on a corrugated cardboard,

 

 

 

cloth, etc. to prevent flaw on the product.

 

 

 

 

 

 

 

 

 

 

 

3) Remove the hooking claws by pushing

 

 

 

with minus screwdriver along with the

Hooking claw

Front cabinet

 

arrow mark in the right figure, and

 

 

 

remove the fan guard.

 

 

2. Attachment

Front cabinet

 

 

1)Insert claws of the fan guard in the hole of the front cabinet. Push the hooking claws (10 positions) with hands and then fix the claws.

CAUTION

All the attaching works have completed. Check that all the hooking claws are fixed to the specified positions.

Fan guard

– 153 –

Page 153
Image 153
Toshiba RAV-SM564SDT-E, RAV-SP804ATZG-E, RAV-SP804ATZ-E, RAV-SP804AT-E Detachment, Attachment, Part name, Procedure, Remarks