6. Defrost control

In heating operation, defrost operation is performed when TE sensor temperature satisfies any condition in A zone to C zone.

The defrost operation is immediately finished if TE sensor temperature has become 12°C or more, or it also is finished when condition of 5°C < TE < 12°C has continued for 80 seconds.

The defrost operation is also finished when defrost operation has continued for 15 minutes even if TE sensor temperature has become 5°C or lower.

ƒAfter defrost operation has finished, the compressor and the outdoor fan start heating operation after stopped for approx. 40 seconds.

Start of heating operation

0

10

15

29

35

[min.]

TE [˚C]

 

 

 

 

 

 

 

–4

 

 

 

 

 

 

 

 

 

 

 

 

 

A zone

–6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

–10

B zone

–25

*

C zone

Dzone

The minimum TE value between 10 and 15 minutes after heating operation has started is stored in memory as TE0.

A zone

Defrost operation is performed in this zone when TE0-TE > 2.5 continued for 20 seconds.

 

 

B zone

Defrost operation is performed in this zone when TE0-TE > 3 continued for 20 seconds.

 

 

C zone

Defrost operation is performed when this zone continued for 20 seconds.

 

 

– 67 –

Page 67
Image 67
Toshiba RAV-SP404ATZ-E, RAV-SP804ATZG-E, RAV-SP804ATZ-E, RAV-SP804AT-E Defrost control, Start of heating operation, Zone