Toshiba RAV-SP454ATZG-E, RAV-SP804AT-E Compressor 2. Mounting of compressor, Part name, Procedure

Models: RAV-SM564SDT-E RAV-SM454SDT-E RAV-SP404ATZ-E RAV-SP404ATZG-E RAV-SP404AT-E RAV-SP454ATZ-E RAV-SP454ATZG-E RAV-SP564AT-E RAV-SP454AT-E RAV-SP564ATZG-E RAV-SP564ATZ-E RAV-SP804AT-E RAV-SP804ATZ-E RAV-SP804ATZG-E

1 177
Download 177 pages 27.24 Kb
Page 161
Image 161

No.

Part name

Procedure

Remarks

6Compressor 2. Mounting of compressor

Compressor lead

1) Mount the compressor in the reverse

Compressor lead

Wind the ferrite core

(Continued)

 

with the compressor

procedure of removal.

 

lead wire by 4 times.

 

 

NOTES:

 

 

Ferrite core

After exchange of the compressor, be sure to

 

 

 

 

 

 

exchange the compressor lead. (Repair part

0 to 50

 

code of compressor lead: 43160591)

 

(Positioning

 

In this time, wrap the ferrite core with the

standard of

 

compressor

 

compressor lead wire by 4 times.

lead wire)

 

Using bundling band on the market, bind the

 

 

 

 

compressor lead. As the compressor lead is

Using the bundling band on the market,

 

long, be sure that the compressor lead does

fix the bundle at 2 positions.

 

not contact with the discharge pipe.

Pass the soundproof plate (outer winding)

 

 

Fix the removed each sensor and PMV coil

through between the suction pipe and

 

lead wire to the discharge pipe and the

the accumulator.

 

 

 

Suction pipe

 

suction pipe with the bundling band via the

 

 

 

Accumulator

 

pipe cover.

 

In this time, take note that each sensor and

Discharge pipe

 

PMV coil lead wire do not come to contact

 

 

 

 

with the discharge pipe and the reactor.

Header pipe

 

 

 

(For fixing to the discharge pipe, use the

 

 

 

 

 

black heat-proof pipe cover and the bundling

 

 

 

 

band for heat-proof which is sold on the

 

 

 

 

market.)

 

 

 

As shown in the right figure, mount the

 

 

 

 

soundproof plate (inner winding, outer

 

 

 

 

winding) by inserting between the compres-

 

 

 

 

sor and the piping, and between piping and

Pass the soundproof plate

 

the partition plate.

 

(inner winding) through

Put the compressor lead wire and the

between compressor and

discharge pipe, suction pipe

 

compressor case thermo between inner

and then put it on the other

 

winding and outer winding of the soundproof

side at this position.

 

 

Put the soundproof plate

 

as if dropping them in.

 

 

 

(outer winding) on the

 

 

 

 

 

 

other side at this position.

 

 

 

Soundproof plate

 

 

 

(upper)

 

Pipe cover, bundling band, TS sensor

 

 

 

Discharge pipe

Soundproof plate (outer winding)

Do not make clearance between the soundproof plate (upper) and the soundproof plate (outer winding).

Black heat-proof pipe cover and heat-proof bundling band,

each sensor (TL, TO, TE, TD, TS sensor) PMV coil lead wire

Set each sensor so that it does not come to contact with the discharge pipe.

Suction pipe

PMV coil lead

Pipe cover, bundling band,

each sensor (TL, TO, TE, TS sensor) PMV coil lead

– 161 –

Page 161
Image 161
Toshiba RAV-SP454ATZG-E, RAV-SP804ATZG-E, RAV-SP804ATZ-E Compressor 2. Mounting of compressor, Part name, Procedure