Toshiba RAV-SP564ATZ-E, RAV-SP804ATZG-E, RAV-SP804ATZ-E service manual Part name, Procedure, Remarks

Models: RAV-SM564SDT-E RAV-SM454SDT-E RAV-SP404ATZ-E RAV-SP404ATZG-E RAV-SP404AT-E RAV-SP454ATZ-E RAV-SP454ATZG-E RAV-SP564AT-E RAV-SP454AT-E RAV-SP564ATZG-E RAV-SP564ATZ-E RAV-SP804AT-E RAV-SP804ATZ-E RAV-SP804ATZG-E

1 177
Download 177 pages 27.24 Kb
Page 157
Image 157

No.

Part name

 

Procedure

Remarks

 

 

 

4

Exchange of 1. Reactor

Reactor relay connector

 

electric parts

1)

Carry out works of 1 of 1 and 3 .

 

(Continued)

(Connected to lead wire

 

2)

Remove the relay connector connected to

(White) at P.C. board side)

 

 

 

 

 

the control P.C. board.

 

 

 

3)

Cut off the bundling band binding the

 

 

 

 

compressor lead and the relay connector.

 

 

 

4)

Remove each reactor.

 

 

 

 

(Truss B tight screw Ø4 × 6, 2 pcs. each)

 

 

 

5)

Attach a new reactor.

 

 

 

NOTE:

 

 

 

Be sure to bind the removed bundling band with

 

 

 

the bundling band on the market.

 

 

 

Be careful that the fan motor lead does not come

Reactor relay connector

 

 

to contact with the reactor body.

(Connected to lead wire

 

 

 

 

(Charcoal gray) at P.C. board side)

 

 

 

 

Fan motor lead

Bundling band

(Compressor lead, reactor lead)

Upper reactor

Connected to reactor relay connector (Connected to lead wire (White)

at P.C. board side)

Bundling band

Lower reactor

Connected to reactor relay connector (Connected to lead wire (Charcoal gray) at P.C. board side)

– 157 –

Page 157
Image 157
Toshiba RAV-SP564ATZ-E, RAV-SP804ATZG-E, RAV-SP804ATZ-E, RAV-SP804AT-E, RAV-SP564ATZG-E Part name, Procedure, Remarks