Toshiba RAV-SP404AT-E Requirement, Detachment, No. Part name, Procedure, Screws, soldering iron

Models: RAV-SM564SDT-E RAV-SM454SDT-E RAV-SP404ATZ-E RAV-SP404ATZG-E RAV-SP404AT-E RAV-SP454ATZ-E RAV-SP454ATZG-E RAV-SP564AT-E RAV-SP454AT-E RAV-SP564ATZG-E RAV-SP564ATZ-E RAV-SP804AT-E RAV-SP804ATZ-E RAV-SP804ATZG-E

1 177
Download 177 pages 27.24 Kb
Page 149
Image 149

No. Part name

Procedure

Remarks

3 Inverter

1. Detachment

 

Screws

assembly

1) Perform work of item 1 of

1 .

 

 

2)Take off screws of the upper part of the front cabinet.

If removing the inverter cover under this

Front cabinet

 

condition, P.C. board can be checked.

If there is no space in the upper part of the

 

 

upper cabinet, perform work of 2 .

 

 

 

 

Inverter cover

 

 

 

 

CAUTION

Be careful to check the inverter because high- voltage circuit is incorporated in it.

3)Perform discharging by connecting + ,

polarities by discharging resistance (approx. 100, 40W) or plug of soldering iron to + ,

terminals of the C14 (printed as “CAU- TION HIGH VOLTAGE”) electrolytic capaci- tor (500µF) of P.C. board.

 

 

 

 

Cord clamp

 

 

 

 

 

 

WARNING

 

 

 

 

 

 

 

 

 

 

 

 

The electrolytic capacitor may not normally

 

 

discharge according to error contents and the

 

 

voltage may remain. Therefore, be sure to

 

 

discharge the capacitor.

 

Screws

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WARNING

 

Plug of

 

 

 

 

soldering iron

 

 

 

 

For discharging, never use a screwdriver and

 

 

Discharging

others for short-circuiting between + and

 

 

position

electrodes. As the electrolytic capacitor is one

 

(Discharging

 

period

with a large capacity, it is very dangerous

 

10 seconds

because a large electric spark will occur.

 

or more)

 

 

 

 

 

 

 

 

4) Take off screws (ST1T Ø4 × 8L, 2 pcs.)

 

 

fixing the main body and the inverter box.

 

Inverter

5) Remove various lead wires from the holder

 

assembly

at upper part of the inverter box and wiring

 

 

holder at right side of the terminal block.

 

 

6)Remove the lead wire from the bundled part at left side of the terminal block.

7)Pull the inverter box upward.

8)Disconnect connectors of various lead wires.

 

REQUIREMENT

 

 

 

 

 

 

As each connector has a lock mechanism,

Remove the connectors

avoid to remove the connector by holding the

with locking function by

lead wire, but by holding the connector.

pushing the part indicated

 

 

 

by the arrow mark.

 

 

 

 

– 149 –

Page 149
Image 149
Toshiba RAV-SP404AT-E, RAV-SP804ATZG-E Requirement, Detachment, No. Part name, Procedure, Screws, soldering iron