
4.19 System board | 4 Replacement Procedures |
4.Turn up the insulator (HNS HOLD RJ INSULATOR) and connect the RJ45 harness to the connector CN4050 on the system board.
NOTE: When replacing a system board with a new one, stick the HNS HOLD RJ INSULATOR in place.
5.Connect the RGB harness to the connector CN9511 on the system board.
6.Turn over the system board.
TECRA M11/Satellite Pro S500M Series Maintenance Manual |