Manuals
/
Xantrex Technology
/
Computer Equipment
/
Power Supply
Xantrex Technology
PV100S-208
manual
Appendix a
Models:
PV100S-208
1
111
124
124
Download
124 pages
2.86 Kb
108
109
110
111
112
113
114
115
Troubleshooting
Specification
Physical Characteristics
Error codes
1Operating States Flow Chart
PV Ground Fault Detection
Time Delay for PV
Wiring Requirements
Warranty
Maintenance
Page 111
Image 111
Appendix A
Schematics
Figure
A-3
PV100S-480
Schematic for Control Power Distribution (152316 E2)
152379 Rev C
A-7
Page 110
Page 112
Page 111
Image 111
Page 110
Page 112
Contents
PV100S 100 kW Grid-Tied Photovoltaic Inverter
Page
PV100S 100 kW Grid-Tied Photovoltaic Inverter
Date and Revision
Organization
Purpose
Scope
Audience
Following conventions are used in this guide
Conventions Used
Related Information
Abbreviations and Acronyms
Page
Important Safety Instructions
Wiring Requirements
General Safety Precautions
Personal Safety
Safety Equipment
Safety
Lockout and Tag
Operational Safety Procedures
De-Energize/Isolation Procedure
Interconnection Standards Compliance
To isolate the PV100S
Xii
Contents
Operation
Troubleshooting
Preventative Maintenance
Commissioning
Specifications
Figures
Figures
Tables
Page
Introduction
Fixed Unity Power Factor Operation
Operation Features
Peak Power Tracking
1Maximum Peak Power Tracking
Utility Voltage/Frequency Fault Automatic Reset
DC Over-voltage Detection
Safety Features
PV Ground Fault Detection
Anti-Island Protection
2PV100S Major Components
Physical Characteristics
Inductor Enclosure
Power Distribution Panel
Power Electronics Matrix
Main Inverter Enclosure
DC Interface Enclosure
Transformer Enclosure
AC Interface Enclosure
4AC Interface Enclosure and Transformer Enclosure
Communications Enclosure
Operator Interface Controls
Main Enclosure Door Interlock Switch
Operator Interface Controls
On/Off Switch
AC and DC Disconnect Switches
Communication Features
System Status and Fault Reporting
Data logging features include
Data Logging
Universal Front Panel Control Unit Ufcu
Communication Methods
10PC Connections in the Communications Enclosure
PC Connection Methods
Wireless Access
Pots Access
Direct Access
Ethernet LAN Access
Specific list of available parameters
GUI Software Features
Operation
Faults
Description of System Operation
Overview
1Operating States Flow Chart
Power Tracking
Operating States
Transition
Matrix Test
Fault
Shutdown
Manual Current
Ufcu Keypad Operation and LCD Display
Operator Interface
Standard Display
LCD Display Initialization Screen
Menu Structure
4Operator Interface Menu Diagram
To Display Any Operational Value in the Read Menu
Read Menu
5Scrolling through the Read Menu
2Read Menu Descriptions
Shut Down Sleep
READ-by-ID
To use the Read-by-ID Feature
3Data Logging Menu
Write Menu
To change Write Menu parameters
Changing and Displaying Write Menu Parameter Values
Minimum Grid
Time Delay for PV
Enable Peak Power
To change the Goal State
Commanding Goal State Changes
To change the Date and Time
Setting the Date and Time
Shutdown → Matrix Test → Shutdown
Shutdown → Power Tracking → Shutdown
Manual State Transitions
Automatic State Transitions
Auto-restart Feature
Any State → Fault
To clear the fault
Energize Procedure Startup
De-Energize/Isolation Procedure Shutdown
To start up the PV100S
9GUI Interface Main Menu Screen
Computer Communications with the PV100S
Starting Setup Manually
Installing the Graphic User Interface GUI Software
Starting the Software Setup Program
Starting the Setup Program Using Autorun
10Starting Setup from a Command Prompt
Starting Setup From a Command Prompt
To continue with the GUI software installation
Model Specific Software Installation
13GUI Setup Start Window
15GUI Setup Progress Indicator Window
Remote/LAN Connection
Running the GUI
18GUI Interface Screen if Connected Directly
Direct Connection
To configure the inverters in the GUI
GUI Configuration Adding Inverters
21Operational Configuration Screen Limits
23Operational Configuration Screen Power Tracker
26Connection Configuration Screen General
27GUI Help Topics
GUI Help
Page
Commissioning
Commissioning Procedure
Starting the Commissioning Test File
To commission the PV100S
Serial Number
Verify AC Voltage
Verify DC Voltage
Inspect Inductor Enclosure
Apply Grid Voltage
Front Panel Display
Confirm AC Operational Parameters
Establish Communications with the GUI
Confirm Power Tracker Configuration Operational Parameters
Confirm DC Operational Parameters
Verify Door Interlock Functions
Thank You for choosing Xantrex The Smart Choice for Power
Operate Inverter
Completed Commissioning
Page
Troubleshooting
Faults and Fault Codes
General Troubleshooting
Respond to any PV100S alarm or fault as follows
1LCD showing Fault Code
Clearing Faults Manually
1Fault Codes
Fault Code Descriptions
Fault Code Descriptions
1Fault Codes
Internal RAM error
1Fault Codes
1Fault Codes
Fpga
PreventativeMaintenance
Maintenance Safety
Operational Safety Procedures
De-Energize/Isolation Procedure
Lockout and Tag
TB4-A
3PV Terminal Locations
Monthly Intervals or As Required
Periodic Maintenance
Inductor Enclosure
Six-month Intervals
Enclosure Seals
Electrical Connections
Page
Specifications
Environmental Specifications
System Specifications
Over Voltage, Under Voltage and Frequency Ranges
Electrical Specifications
TB2
Wire Gauge and Torque Requirements
Figure A-1Electrical Diagram sample
Schematics
Appendix a
Schematics
Appendix a
Schematics
Appendix a
This page intentionally left blank
Xantrex Limited Warranty
Warranty and Product Information
Product Disclaimer
Product Registration
Warranty and Return WA-4 Rev C
Index
IX-2 Rev C
Page
Xantrex Technology Inc
Top
Page
Image
Contents