Manuals
/
Xantrex Technology
/
Computer Equipment
/
Power Supply
Xantrex Technology
PV100S-208
manual
Models:
PV100S-208
1
78
124
124
Download
124 pages
2.86 Kb
75
76
77
78
79
80
81
82
<
>
Troubleshooting
Specification
Physical Characteristics
Error codes
1Operating States Flow Chart
PV Ground Fault Detection
Time Delay for PV
Wiring Requirements
Warranty
Maintenance
Page 78
Image 78
2–38
Page 77
Page 79
Page 78
Image 78
Page 77
Page 79
Contents
PV100S 100 kW Grid-Tied Photovoltaic Inverter
Page
PV100S 100 kW Grid-Tied Photovoltaic Inverter
Date and Revision
Audience
Purpose
Scope
Organization
Conventions Used
Following conventions are used in this guide
Abbreviations and Acronyms
Related Information
Page
Important Safety Instructions
Safety Equipment
General Safety Precautions
Personal Safety
Wiring Requirements
Safety
Operational Safety Procedures
Lockout and Tag
De-Energize/Isolation Procedure
Interconnection Standards Compliance
To isolate the PV100S
Xii
Contents
Operation
Troubleshooting
Preventative Maintenance
Commissioning
Specifications
Figures
Figures
Tables
Page
Introduction
Operation Features
Fixed Unity Power Factor Operation
Peak Power Tracking
Utility Voltage/Frequency Fault Automatic Reset
1Maximum Peak Power Tracking
Anti-Island Protection
Safety Features
PV Ground Fault Detection
DC Over-voltage Detection
Physical Characteristics
2PV100S Major Components
Main Inverter Enclosure
Power Distribution Panel
Power Electronics Matrix
Inductor Enclosure
DC Interface Enclosure
Transformer Enclosure
AC Interface Enclosure
Communications Enclosure
4AC Interface Enclosure and Transformer Enclosure
Main Enclosure Door Interlock Switch
Operator Interface Controls
On/Off Switch
Operator Interface Controls
Communication Features
AC and DC Disconnect Switches
System Status and Fault Reporting
Data logging features include
Data Logging
Communication Methods
Universal Front Panel Control Unit Ufcu
PC Connection Methods
10PC Connections in the Communications Enclosure
Pots Access
Wireless Access
Ethernet LAN Access
Direct Access
GUI Software Features
Specific list of available parameters
Operation
Faults
Description of System Operation
Overview
1Operating States Flow Chart
Power Tracking
Operating States
Transition
Manual Current
Fault
Shutdown
Matrix Test
Operator Interface
Ufcu Keypad Operation and LCD Display
LCD Display Initialization Screen
Standard Display
4Operator Interface Menu Diagram
Menu Structure
Read Menu
To Display Any Operational Value in the Read Menu
5Scrolling through the Read Menu
2Read Menu Descriptions
Shut Down Sleep
To use the Read-by-ID Feature
READ-by-ID
3Data Logging Menu
Write Menu
Changing and Displaying Write Menu Parameter Values
To change Write Menu parameters
Minimum Grid
Time Delay for PV
Enable Peak Power
Commanding Goal State Changes
To change the Goal State
Setting the Date and Time
To change the Date and Time
Automatic State Transitions
Shutdown → Power Tracking → Shutdown
Manual State Transitions
Shutdown → Matrix Test → Shutdown
Auto-restart Feature
Any State → Fault
To clear the fault
Energize Procedure Startup
De-Energize/Isolation Procedure Shutdown
To start up the PV100S
Computer Communications with the PV100S
9GUI Interface Main Menu Screen
Starting the Setup Program Using Autorun
Installing the Graphic User Interface GUI Software
Starting the Software Setup Program
Starting Setup Manually
Starting Setup From a Command Prompt
10Starting Setup from a Command Prompt
Model Specific Software Installation
To continue with the GUI software installation
13GUI Setup Start Window
15GUI Setup Progress Indicator Window
Running the GUI
Remote/LAN Connection
Direct Connection
18GUI Interface Screen if Connected Directly
GUI Configuration Adding Inverters
To configure the inverters in the GUI
21Operational Configuration Screen Limits
23Operational Configuration Screen Power Tracker
26Connection Configuration Screen General
GUI Help
27GUI Help Topics
Page
Commissioning
Commissioning Procedure
Starting the Commissioning Test File
To commission the PV100S
Serial Number
Verify AC Voltage
Verify DC Voltage
Inspect Inductor Enclosure
Apply Grid Voltage
Front Panel Display
Establish Communications with the GUI
Confirm AC Operational Parameters
Confirm Power Tracker Configuration Operational Parameters
Confirm DC Operational Parameters
Verify Door Interlock Functions
Thank You for choosing Xantrex The Smart Choice for Power
Operate Inverter
Completed Commissioning
Page
Troubleshooting
Faults and Fault Codes
General Troubleshooting
Respond to any PV100S alarm or fault as follows
Clearing Faults Manually
1LCD showing Fault Code
Fault Code Descriptions
1Fault Codes
Fault Code Descriptions
1Fault Codes
Internal RAM error
1Fault Codes
1Fault Codes
Fpga
PreventativeMaintenance
Maintenance Safety
Operational Safety Procedures
De-Energize/Isolation Procedure
Lockout and Tag
TB4-A
3PV Terminal Locations
Periodic Maintenance
Monthly Intervals or As Required
Electrical Connections
Six-month Intervals
Enclosure Seals
Inductor Enclosure
Page
Specifications
System Specifications
Environmental Specifications
Electrical Specifications
Over Voltage, Under Voltage and Frequency Ranges
Wire Gauge and Torque Requirements
TB2
Figure A-1Electrical Diagram sample
Schematics
Appendix a
Schematics
Appendix a
Schematics
Appendix a
This page intentionally left blank
Warranty and Product Information
Xantrex Limited Warranty
Product Disclaimer
Product Registration
Warranty and Return WA-4 Rev C
Index
IX-2 Rev C
Page
Xantrex Technology Inc
Top
Page
Image
Contents