Operation
5.Fill out the Operational Configurations Information in the form shown in Figure
a)Fill out Operational Limits Information requested.
b)Click on the PV
Form Tab
Fill out all the required information on this form.
Figure 2-21 Operational Configuration Screen - Limits
c)Fill out PV Information requested.
d)Click on the Power Tracker
Form Tab
Fill out all the required information on this form.
Figure 2-22 Operational Configuration Screen - PV
152379 Rev C |