About This Manual

Purpose

The purpose of this Operation and Maintenance Manual is to provide explanations and procedures for operating, maintaining, and troubleshooting the PV100S 100 kW Grid-Tied Photovoltaic Inverter. Installation instructions are available in the PV100S 100 kW Grid-tied Photovoltaic Inverter Planning and Installation Manual.

Scope

This Manual provides safety guidelines and information about operating and troubleshooting the unit.

Audience

This Manual is intended for anyone who needs to operate the PV100S 100 kW Grid-Tied Photovoltaic Inverter. Operators must be familiar with all the safety regulations pertaining to operating high-voltage equipment as dictated by local code. Operators must also have a complete understanding of this equipment’s features and functions.

Organization

This Manual is organized into five chapters and one appendix.

Chapter 1, “Introduction” contains information about the features and functions of the PV100S 100 kW Grid-Tied Photovoltaic Inverter.

Chapter 2, “Operation” contains information on the basic operation of the PV100S 100 kW Grid-Tied Photovoltaic Inverter.

Chapter 3, “Commissioning” contains information on safely commissioning the PV100S 100 kW Grid-Tied Photovoltaic Inverter.

Chapter 4, “Troubleshooting” contains information and procedures for troubleshooting the PV100S 100 kW Grid-Tied Photovoltaic Inverter. It provides descriptions of common situations and errors that may occur and provides possible solutions for resolving fault conditions. It also provides instructions for clearing faults manually, if required.

Chapter 5, “Preventative Maintenance” contains information and procedures for performing preventative maintenance on the PV100S 100 kW Grid-Tied Photovoltaic Inverter.

Appendix A provides the environmental and electrical specifications for the PV100S 100 kW Grid-Tied Photovoltaic Inverter.

152379 Rev C