Wideband - Basic Test

Wideband - Full Test

The Wideband - Full Test includes a resistive balance test (using special resistance) that requires a different test lead connection. When this part of the Autotest is reached, the user will be requested to swap the black and green test leads or to skip this test.

To run this test after the leads have been swapped, press the [Enter] key. To skip this test (and not change the test lead connection), press the [Tab] key. If the resistive balance test is run, be sure to properly reconnect the 965DSP test leads to the original hookup when the test is complete.

126

Page 126
Image 126
3M 965DPS instruction manual Wideband Basic Test Wideband Full Test